CALHOUN COUNTY ROAD COMMISSION
August 14, 2008 - August 21, 2008
CITY OF ALBION
• Project: Reconstruction
• Total Cost Estimate: $403,113
• Disruption: Road closed with traffic detour in place
• Completion: August 31, 2008
• Road: N. Clark Street from E. Michigan Avenue (M-99) to E. North Street
ECKFORD TOWNSHIP
• For the safety of the motoring public, CCRC has closed the crossing over the Ball, Patterson, Hopkins & Chase Drain between D and E Drive South in Eckford Township. Advance warning signs and barricades have been placed at D and E Drive South at 21 Mile Road and additional barricades have been placed on both sides of the crossing.
EMMETT TOWNSHIP
• Project: Culvert repair
• Total Cost Estimate: To be determined
• Disruption: Road closed at work zone – traffic detour is in place
• Completion: Approximately 4 weeks
• Road: 6 ½ Mile Road between D and E Drive North
BEDFORD TOWNSHIP
• Project: New construction/realignment of the Custer Drive Bridge over the Kalamazoo River
• Total Cost Estimate: $1,900,541.63
• Disruption: New bridge open to traffic
• Completion: Open to traffic. Demolition of the old bridge start date to be determined (no traffic disruption)
• Road: Custer Drive over the Kalamazoo River between M-89 and River Road
CHIP AND SEAL OPERATIONS
Please note that chip and seal operations are dependent upon dry weather. Rain showers or even the threat of rain showers will delay seal coating.
CLARENCE TOWNSHIP
• Project: Chip & Seal
• Total Cost Estimate: $53,582
• Disruption: Road closures for short period of time during the process. Do not park vehicles on the road. Any vehicle that is parked on the road during this time will be towed at the owner’s expense.
• Completion: August 25, 2008
• Road: 26 Mile Road from L to S Drive North
LEE TOWNSHIP
• Project: Chip & Seal
• Total Cost Estimate: $14,600
• Disruption: Road closures for short period of time during the process. Do not park vehicles on the road. Any vehicle that is parked on the road during this time will be towed at the owner’s expense.
• Completion: August 25, 2008
• Road: Old 27 from V Drive North to Baseline
MARENGO TOWNSHIP
• Project: Chip & Seal
• Total Cost Estimate: $53,488
• Disruption: Road closures for short period of time during the process. Do not park vehicles on the road. Any vehicle that is parked on the road during this time will be towed at the owner’s expense.
• Completion: August 25, 2008
• Roads: Partello Road from I-94 to the east 2 miles
18 ½ Mile Road from I-94 to G Drive North
MARSHALL TOWNSHIP
• Project: Chip & Seal
• Total Cost Estimate: $65,122
• Disruption: Road closures for short period of time during the process. Do not park vehicles on the road. Any vehicle that is parked on the road during this time will be towed at the owner’s expense.
• Completion: August 25, 2008
• Roads: 16 Mile Road from Division to A Drive North
A Drive North from 12 Mile Road to the east 2 ½ miles
Michigan Avenue/Eden from 13 Mile Road to Eden
15 Mile Road from Michigan Avenue to A Drive North
Please note that chip and seal operations are dependent upon dry weather. Rain showers or even the threat of rain showers will delay seal coating. During the chip and seal process, roads will be closed for a short period of time. . Do not park vehicles on the road. Any vehicle that is parked on the road during this time will be towed at the owner’s expense. |